Latest Rebuilding June 2001
I found that the rear wall of the wheel house was completely rotted from termites and then fresh water.
So, I replaced it, but I thought I would enclose the area to get one crew bunk out of it...
You Can click on each photo to see a larger photo...
And then click the 'BACK BUTTON' to return here....
How it use to look....
The old wall was pretty well rotted out...In fact, I pushed my foot right through it.
First wall in....Have to cut the existing roof end to epoxy to the new one...
Built the new walls and roof to match the existing...roof is 2 layers 3/4" ply...everything was put together with 5200 and hot dipped galvanized screws..and fiberglassed with 10 ounce biaxial cloth and epoxy resin....
Got it all Closed in...First cuts on roof...
Inside out...nice bunk.. 74" long by 41" wide...
New Rear View....
Port view.....
And
the Bait tanks all refiberglassed and epoxied...
